boand3
boand3 boand3
  • 04-05-2018
  • Mathematics
contestada

A construction company needs to remove 2 1/6 tons of dirt from a construction site. They can remove 7/8 tons of dirt each hour. What is the total number of hours it will take to remove the dirt?

Respuesta :

jupjupjupjup202 jupjupjupjup202
  • 04-05-2018
The answer is 4.

Hope I helped :)
Answer Link

Otras preguntas

There are 4 times as many used cars in the car dealer ship lot is there a new car there are 120 cars total in the dealership like how many new cars are in the d
Match the drug with the street name or classification. 1. Steroids 2. Inhalants 3. LSD 4. Cocaine 5. Marijuana 6. Heroin 7. Methamphetamine 8. Depressan
5x + 20 =3x +66 please help me with this problem
When conducting research for a thesis paper, what is the best way to determine the author’s point of view?
What is a quartic function with only the two real zeros given? x = -4 and x = -1
Which word correctly completes this sentence?  we'll need a _____ amount of luck to win the game.   a. dry   b. senseless   c. considerable   d. reliable?
how many atoms are there in 5.7 mol of hafnium?
If the sin 30 degrees is 1/2, then the cos
a government can be both a monarchy and a anarchy at the same time?
What were the main social classes of early china?