The easiest and cheapest time to alter the information system is in theâ ________ phase.

a. system definition

b. implementation

c. requirements analysis

d. component design

e. system maintenance

Respuesta :

fireflies854 fireflies854
  • 04-04-2018
d or c hope this helps

Answer Link

Otras preguntas

the cost of 3 bottles of apple spread is $7.41. what is the cost of each bottle of apple spread? $1.62 $2.47 $4.41 $10.41
What is the number 277,180 in expanded form
Tell me ways to remember answers ?
you calculate the area of a 150 m × 100.0 m room. how many significant figures should your answer include? a. 1 b. 2 c. 3 d. 4
Which was NOT a primary motivation for Republicans to promote Congressional Reconstruction over those policies proposed by Lincoln and Johnson? A)Congress felt
which symbol will make the number sentence –|16| ? 16 true? = ≠ < >
Which eight-letter word still remains a word after removing each letter from it.
Based on what you know about Russian climates, which city would likely be the most difficult to travel to? Moscow Volgograd Noril'sk Novgorod
A go-kart's speed is 607,200 ft per hour. What is the speed in miles per hour?
what criteria are used to distinguish between a chemical change and a physical change