pieman33333 pieman33333
  • 04-04-2018
  • Mathematics
contestada

Three workers can do a job in 28 hours. How many more workers are needed to do this job in 12 hours?

Respuesta :

MrRamon
MrRamon MrRamon
  • 13-04-2018
4 additional workers for 7 total workers.
if it takes 3 workers 28 hours to do work there are 84 total hours of work (3*28=84) to find how many workers it will take to get the work done in 12 hours divide 84 by 12. 84/12= 7 total workers. 7-3= 4 additional workers needed.
Answer Link
pranilraichura
pranilraichura pranilraichura
  • 08-03-2020

Answer:

4 workers

Step-by-step explanation:

Answer Link

Otras preguntas

A canoe travels 3 ¾ kilometers in ⅗ of an hour. What is the average speed of the canoe, in kilometers per hour?
Convert the following expressions with rational exponents to the radical form (b)^6/5
The mass of the beaker and the liquid was 1037 g. The mass of the empty beaker was 350 g. What was the mass of the liquid?
Mustafa is packing 7 copies of into this box . Mustafa puts one of the books in it it fits perfectly on the bottom with no space around edges all of the books f
If f(1)=5 and f(n)=-2f(n-1)-5 then find the value of f(4)
(x-20)²=x²-20 show your working out
Represent the following in extensive game format: A diplomat can choose to summon a terrorist his country is sponsoring to a meeting, or not. If he does not, an
A person needs to fill 10 water jugs with a hose. Filling the first 2 jugs has taken 3 minutes. How long to finish filling the remaining jugs?
voolume for r=6in h=10in cylinder
Multiplying a number by 9 and subtracting 6 is 16 less than twice the number. Find the number.