RoboticNaruto4693 RoboticNaruto4693
  • 03-01-2018
  • Physics
contestada

How much work is done when a hoist lifts a 290-kg rock to a height of 7 m?

Respuesta :

samuraijack
samuraijack samuraijack
  • 03-01-2018
Given: Mass m = 290 Kg;  Height  h = 7 m

Required: Work = ?

Formula: Work = Force x distance  but, Force F = mg

W= fd

W = mgh

W= (290 Kg)(9.8 m/s²)(7 m)

W = 19,894 Kg.m²/s²

W = 19,894  J




  
Answer Link

Otras preguntas

A 9-cut cheese pizza is 1,800 calories. How many calories in 2 slices?
jared bought a cell phone for $42. Juanita spent 1 1/2 times as much how much did she spend
Select the false statement below about completing ics records or forms. a. fill in all blanks. use n/a as appropriate. b. avoid using military 24-hour time.
Question: Multicellular organisms have five levels of organization ranging from simplest to most complex. The simplest level is the cellular level. This is
Where is the ion charge located in the isotope symbol
What are bond ratings? do ratings remain the same during the entire life of the bond?
What does rodriguez mean by comedy and tragedy of mexico and california?
If 5y 3x = 4, what is the value of 15y 9x?
Which of the following is least important to consider before choosing a fitness activity? a. the level of personal interest b. the popularity of the activity
Irving has a card collection with 64 basketball cards 32 football cards and 24 baseball cards he wants to arrange the cards in equal piles with only one type of