agyasmithmartersax agyasmithmartersax
  • 01-05-2017
  • Mathematics
contestada

An average of 2,000 charts need to be coded each month. if it takes an average of 15 minutes to code each chart— how many charts does the average coder code per 8-hour day?

Respuesta :

Bea1111 Bea1111
  • 01-05-2017
Put 8 hours into minutes which is 60•8= 480.
Then divide 480 by 15 to find how many charts are coded in 8 hours by a coder.
480/15= 32.

So the average worker codes 32 charts per 8-hour work day.
Answer Link

Otras preguntas

Which of these scenarios describes a person demonstrating a key value of Hinduism? .
Which of the following most accurately identifies the usual length of a short story? A. 100 to 200 words B. 200 to 1,000 words C. 500 to 10,000 wo
six and one hundred eighty-thousandths in standard form
Victoria spins the spinner 18 times, and it stops at the letter 'B' 10 times. If she spins the spinner a 20th time, what is the theoretical probability that thi
What is 7 2/5 minus 1 4/5
What is the main job of a state's governor? A. to build goodwill with neighboring states B. to establish trade and commerce routes across the state C.
30 min before test please help !!numbers 13 and 14
Choose the sentence that uses commas correctly. Consider that the correct sentence may not require commas. In China people first wrote on silk, but then some
ᴘʟᴇᴀsᴇ ғᴏʀ 10 ɢʀᴀᴅᴇs ɴᴏᴛ ᴏɴʟʏ ᴛʜɪs ɪ ʜᴀᴠᴇ ᴍᴏʀᴇ ᴘʟᴇᴀsᴇ ʜᴇʟᴘ ᴍᴇ
Which of these genes is not a part of the lac operon?