tyleryates30 tyleryates30
  • 03-08-2022
  • Business
contestada

3. What is the second rule of risk management?

a. Share the risk.

b. Transfer the risk.

c. Avoid the risk.

d. Document the risk.

Respuesta :

yendi888 yendi888
  • 03-08-2022
Avoid the risk(c) because if your doing risk management u need to know what type of risk are there to avoid the risk
Answer Link
willismorgan367 willismorgan367
  • 03-08-2022
Number C is your correct answer for this question
Answer Link

Otras preguntas

In the triple beam balance virtual lab, which objects have a mass greater than 100 grams?
Can someone help me with this one please ? Thanks!
Q: How are two ecozones always different from each other? A: A.They have different climates. B.They have different political systems. C.They have different ec
a good example of the constitutional principle of checks and balances is
Edin has £300 pounds in his saving account. His bank offers him a simple 5% interest rate per annum, for a period of three years. How much interest will he have
The figure shown below is an isosceles trapezoi. The two sides that are not parallel have the same length. How could you add this shape to the family tree diagr
tissue covers the outer surface of herbaceous or soft stemmed plants whats its called
Which of the following statements is correct? A) P and S waves travel through liquids, but P waves do not travel through solids. B) P waves travel through solid
Given that f(x)=x 2+3x+6 and g(x) =x-3, solve for f(g(x))when x=1
A woman has been brought to the emergency room because she says that she has been seeing green ooze running down the walls of her bedroom. she is demonstrating: