henriquefvboas68241 henriquefvboas68241
  • 01-08-2022
  • Business
contestada

In general, the production manager is responsible for the materials price variance. True or false?.

Respuesta :

PallasAthena23
PallasAthena23 PallasAthena23
  • 01-08-2022
False

In general, materials price variance is the responsibility of the purchasing manager, not the production manager.
Answer Link

Otras preguntas

Judge the truthfulness of the following statement: if a short story does not have an immediately recognizable theme, it must not be a story of literary merit. a
Stevie earned $600 this week. she used $100 toward paying off her credit card and $20 went into savings, for a total of $120, which is 20% of her income. what m
In form of a Venn diagram compare and contrast the difference writing methodology ​
How is Mary Shelley’s Frankenstein an epistolary novel? A. It is written using the first-person point of view. B. It is written primarily through the use of let
What did the mother and the boys do on day three? The Swiss family robinson
Suppose that both of the events you have just analyzed are partly responsible for the increase in the price of hamburgers. Based on your analysis of the explana
Which is a characteristic of nuclear fission?
write an equation for a prabola with a vertex at the origin, passing through(5,6), and symmetric with respect to the x-axis
Calculate the standard deviation for the following data set: Data set: 4, 14, 6, 2, 7, 12
You design a bean bag toss board using a coordinate plate. You plot vertices of the board at C (3,2) D (3,6) E (5,2) F (5,6). What is the perimeter of the bean