josephmarvens2787 josephmarvens2787
  • 04-03-2022
  • Biology
contestada

When was the keystone pipeline scheduled to be completed.

Respuesta :

Аноним Аноним
  • 04-03-2022

Answer:

2021 - 2022, but the truth is it never got completed.

Answer Link

Otras preguntas

Find the slope for each line. And can you show me how you did it.
what is the value of n if n divided by 256 = 8 1/3 times 8 1/3?
bacteria have many roles on earth select all correct responses Help make some types of food for humansPathogensMutualist like the large intestine of humans maki
issues $10,000,000, 7.8%, 20-year bonds to yield 8% on January 1, 2018. Interest is paid on June 30 and December 31. The proceeds from the bonds are $9,802,072.
Because successive units of a good produce less and less additional satisfaction, the price must fall to encourage a buyer to purchase more units of the good. T
The sides of the hexagon shown are equal in length. The perimeter of the hexagon is at most 42 inches . Find the possible side lengths of the hexagon
George uses the DSM, and believes that it provides a very accurate means of diagnosing mental health disorders in his clients. In other words, George has faith
how do scientist in the present-day end up being able to study the Triassic era
Which two events took place after the Tiananmen Square protests in 1989? The Chinese government declared discussions on the Tiananmen Square incident illegal. T
Which option keep two paragraphs together for the purpose of comparing or contrasting? A). Page breaks before option B). Keep with next option C). Keep lines t