contestada

Jin schedules 496 hours for a project. He plans to work 8 hours each day. How many days will it take to complete the project?​

Respuesta :

penguinlife90 penguinlife90
  • 01-12-2021

Answer:

62 days

Step-by-step explanation:

496/8 = 62

Answer Link
clickykeyboardasmr
clickykeyboardasmr clickykeyboardasmr
  • 01-12-2021

496/8=62

Hope this helps!

Answer Link

Otras preguntas

How would the u.s. government most likely react to a slump in the economy?
When the number 2.35 is rounded to contain 2 significant figures it becomes 2.4?
Rights that the accused has when suspected of a crime
The Clarks have driven 250 miles on their trip. They have completed 5/8 of their drive. How long is their entire trip?
Some studies suggest that amphetamines make a driver __________ times more likely to be in a crash.
Why is it useful to use moles to measure chemical quantities?
Tell us about a peer who has made a difference in your life essay example
If pharmaceutical researchers want to learn how to keep cancer cells from dividing uncontrollably, which approach are they most likely to try?
When half the positive difference between the 13th and 23rd natural numbers is added to the 34th even natural number, what is the result? (The natural numbers a
What is a primary function of the body covering of terrestrial animals?