ginapogones6676 ginapogones6676
  • 02-07-2021
  • Business
contestada

A costing system that uses actual costs for direct materials and labor and predetermined overhead rates to apply overhead is called a(n)

Respuesta :

topeadeniran2 topeadeniran2
  • 07-07-2021

Answer: normal costing system

Explanation:

A costing system which uses the actual costs for direct materials and the labor and predetermined overhead rates to apply overhead is referred to as the normal costing system.

Normal costing system is the cost allocation method whereby cost is assigned to products which are based on the labor, materials, and the overhead which are used in their production.

Answer Link

Otras preguntas

45 EXTRA POINTS ***************************************************************************************** A researcher posts a radio advertisement offering $35
The four-sided geometric figure pictured is called a parallelogram. One feature of parallelograms is that opposite sides have equal lengths. The dotted line
Please help thanks!!
Number 11 and 12 need answers
I need help on this question
Write each, or phrase as an expression, equation, inequality. 1. six times a number is greater than 12 __________________ 2.the sum of 2 and the
HELP PLEASE! i really need help.
How did colonist respond to the Townsend acts?
How does the excerpt from chapter 5 reveal the Time Traveller's initial theory of the social structure that exists in the future society he visits? What is his
A student solving a physics problem for the range of a projectile has obtained the expression r= v20sin(2θ)g where v0=37.2meter/second, θ=14.1∘, and g=9.80meter