Monkeyfeet Monkeyfeet
  • 03-10-2020
  • Mathematics
contestada

A construction company needs to remove 24 tons of dirt from a construction site. They can remove 3/4 tons of dirt each hour. How long will take to remove the dirt? Write your answer in hours.

Respuesta :

zaynah29cfc
zaynah29cfc zaynah29cfc
  • 03-10-2020

Answer: 32 hours?

Step-by-step explanation:

24 / (3/4) = 32

Answer Link

Otras preguntas

in a direct democracy who votes on government policy
What is 8.517 in word form
Rain, hail, sleet and snow are all examples of
what's longer east or west
What is the different between child growth and child development?
Debra has 2/3 of a pound of loose green tea leaves. If she wants to keep one-half if the tea at home and the other half at work, what fraction of a pound will s
Which is an example of the bottleneck effect? Green beetles move to a new location and build a new colony there. Green beetles survive as birds don't see them
Describe how insulation works and the role it plays in keeping our homes at a comfortable temperature.
What animals may be found in each zone?—be specific on listing them •Upper •Middle •Lower
Esteban counted the number of steps it took him to walk to school.He counted 1,138 steps.How many steps does he take walking to and from school each day?